Call Us: +971509256911 Email: info@cbox-dubai.com
Prefabricated Workforce Housing Units Buildings
Item | Specification |
Life span | 12-15 years |
Wind resistance | 88.2-117 km/h |
Earthquake resistance | 7 grade |
Structure | steel structure |
Partition wall | sandwich panel |
Wall | sandwich panel |
Roof | sandwich panel |
Windows | PVC sliding window |
Doors | steel door/sandwich panel door |
Time to install |
100 sqm by 4 workers /day |
Color |
blue, white, red |
Fireproof |
B2 B1 A2, A1 |
Prefab construction takes significantly less time to build than on-site construction. In many instances, prefabrication takes less than half the time when compared to traditional construction. This is due to better upfront planning, elimination of on-site weather factors, subcontractor scheduling delays, and quicker fabrication as multiple pieces can be constructed simultaneously. Shorter construction times allow construction companies to take on multiple projects at once.