10 Days Installation Temporary Container House For Office

10 Days Installation Temporary Container House For Office

Description

Quantity: 136 containers
Product Time: 15 days
Installation Time: 10 days
  • Item NO.:DC007

  • Lead Time:15 working days

  • Brand:Cbox

  • Color:Customized

Send Enquiry

Specification

10 Days Installation Temporary Container House For Office

 

temporary container house

 

Guangdong Cbox is equipped with a professional design team, which can provide complete CAD drawings, model design drawings, construction drawings, circuit diagrams, etc.

After that, we are equipped with 30 factories and have the country's leading fully automatic production line, which can realize modular production with high efficiency and low material consumption.

In addition, if necessary, our Guangdong Cbox can provide installation services. If the quantity is more than 300 sets, we can guide the installation for free, you only need to be responsible for the engineer's visa, air tickets, and room and board expenses.

 

C-BOX Project


 

container office

 

Office:Removable, Expandable, Reusable, 20 Years Life
Type: Flat Pack Prefab Container Office
Application: Temporary offices in construction sites, office built in workshops, low-cost outdoor offices.
Advantages: Short installation time, 1-15 days, depending on the project, a single container office only needs one day to complete the installation. 

 

container hospital

 

Cabin Hospital: Fast, Durable, Safe
Type: Flat Pack Prefab Container Cabin Hospital
Application: Responding to a sudden illness that results in the need to isolate patients or expand the hospital.
Advantages: The installation time is short, 7-20 days, depending on the project. We have participated in or independently completed 15 makeshift hospital projects, including the famous project Huoshenshan Hospital.

 

container dormitory

 

Dormitory: Fast, Fully Furnished, Stable

Type: Flat Pack Prefab Container Dormitory

Application: Due to site conditions, or the need to build a dormitory in a short period of time.

Advantages: Short installation time, 2-15 days, depending on the project. We can provide a variety of supporting facilities, such as beds, air conditioners, tables and so on.

 

 

C-BOX Service


 

container van house philippines

 

Free Design Service:CAD + Effect Drawing
More than 15 designers and engineers, while providing professional advice, can also ensure compliance with customer requirements.

 

container van house

 

Customized Service:Size, Appearance, Color, Material, etc., Can be customized
According to customer requirements, we can also customize the thickness of steel, appearance color, anti-rust treatment, wall panels, bottom plates, etc.

 

container homes from china

 

Loading Service: if there are other goods, we can help to load
If customers have purchased products from other places and need to be loaded together, we can provide container loading services for free

 

 

C-BOX Prefab Container House


 

Note:All our products can be customized, if you need better configuration, or other special requirements, please consult our staff.

 

detachable container house

 

Steel: Q235B Stainless Steel, 2.3mm
Q235B has certain elongation, strength, good toughness and castability, easy to punch and weld, and is widely used in the manufacture of general mechanical parts. It is mainly used for welded structural parts with high quality requirements in construction and bridge engineering.

 

 

1. Bottom frame corners 2. Bottom frame secondary beam (12*2.0 C-shaped steel) 3. Bottom frame long side beam (5635mm)
4. Cement fiber board (18mm) 5. 2mm PVC Carpet 6. Column cover  (2600mm)
7. Column (2535mm) 8. UPVC windows + anti-theft net 9. Ceiling color steel plate
10. Glass wool insulation layer 11. Roofing color steel plate (0.45mm) 12. Top frame secondary beam
13. Top frame long side beam (5635mm) 14. Top frame corners 15. Top frame short side beam (2690mm)
16. Top frame secondardy beams 17. Top frame long side beam (5635mm) 18. Column (2535mm)
19. 50mm diamater drain pipe 20. Rock wool sandwich panel(75mm) 21. Skirting lines
22. Bottom tie beam square tube 23. Bottom frame short side beam (2690mm)  

 

 

 

Anti-rust: Spray Paint(110μ/㎡) + Galvanized
The anti-corrosion treatment of many suppilers is only made of spray paint, and the density is only 80μ/㎡, which may rust in 2-3 years, resulting in a significant reduction in service life. But we will do galvanize first, and then spray 110μ/㎡ anti-rust paint, which can usually reach 10 years of anti-rust time. Greatly provides longevity.
 
container homes from china

 

 

 

container house floor Wall + Floor:Choose high-quality fire and moisture-proof materials
Wall panel: rock wool/glass wool color steel plate.Fire rating: Class A; Water-proof rating: Class AFloor: PVC+glass magnesium board or PVC+cement.It has very good hardness, and it is also a fireproof and Water-proof material

 

Window and Door: Steel Doors + Aluminium Alloy Window
Steel Doors:Use high-quality stainless steel doors, 10 years without rustAluminium Alloy Window:Durable, no rust, easy to install
We have different configuration options, please contact our sales for details.
container home

 

 

C-BOX's Strength


 

 

cbox factory cbox office container hospital
32,000㎡ Production Base & Over 1200 Staffs
Top-5 Prefab Container House Supplier in China
Participated in the construction of Huoshenshan Hospital

 

 

cbox certificate

 

Certification
Attached below certification codes for checking:

 

CE Cetrification No:  HTT190405290L
ISO9001:20015 Cetrification No:  HG19Q0058R0M
Utility Patent Utility Patent No:  ZL 2015 2 0608859.0
Alibaba Verified Verified Type: Multispecialty Supplier

 

 

FAQ


 

1. How much manpower and time does it take to install the container?
2 hours + 4 workers=1 unit

2. What tools and equipment do I need to prepare for the installation of container?
Crane, hand saw, hand drill, hexagonal screwdriver, rubber hammer, utility knife, hole saw, non-slip gloves, glass glue gun, tape measure, medical box, marker, foot ladder, spirit level.

3. How many days is your fastest lead time?
This depends on the quantity. If it is a regular size, our lead time is generally 7-15 days after receiving the deposit

4. Can you customize colors?
We are happy to accept color customization. The regular color of our boxes is white, which is popular and well received by customers all over the world. You can also provide the color card number for our reference. What color do you like?

5. What is the largest size that can be made?
The maximum can be 4m*8m, and the 8m surface is equipped with wind-resistant columns to support the top and bottom beams. What kind of functions and requirements are you based on?

6. What is your payment method?
Our payment method is generally TT (wire transfer), 30